The most common complaint in this market is not price. It is silence — unreturned calls, moving start dates, and estimates that climb after demolition. Here is how to avoid it, whether or not you hire us.
Most contractors who go quiet are not running a scam. They took six jobs when they had capacity for three, they are underwater on a project that went sideways, and yours is the one that slipped. That is small comfort when your slab has been sitting exposed for two months, but it tells you what to screen for: capacity and process, not charm.
The second cause is the free estimate. When an estimate costs the contractor money and produces no revenue, the incentive is to give an optimistic number fast, win the job, and find the rest of the money later through change orders. You have seen the result.
Ask every contractor you interview, including us. The answers tell you more than the price does.
Then verify it yourself with the North Carolina Licensing Board for General Contractors. A contractor who hesitates on this question has told you everything.
General liability and workers' compensation, current, with your project address listed if requested. Uninsured work on your property is your liability.
You want a straight answer. A small outfit running eleven simultaneous projects is telling you where yours will land in the queue.
One name, one phone number, one person who answers. Not a rotating cast of subs with nobody coordinating.
A one-line number is not an estimate. You want line items and explicit allowances for finishes so you know exactly what triggers an overage.
If a contractor asks you to pull the permit as the homeowner, walk away. That is frequently a sign of a license problem, and it shifts liability onto you.
Draws tied to completed milestones, not a large deposit up front and hope. Never pay for the whole job before it exists.
Anyone who tells you a permitted structure starts next week and finishes in three has not accounted for plan review. Honest scheduling is a leading indicator.
Ask for the change order process in writing. How it gets priced, who approves it, and how it is documented.
Not the three best. The last three, including any that went badly. How a contractor talks about a difficult job tells you how they will talk about yours.
The unlicensed math never works. The savings on an unlicensed build evaporate the moment you need an inspection, file an insurance claim, or try to sell the property with an unpermitted structure on it.
We do take over abandoned or stalled outbuilding projects, but honestly — not always. Taking on someone else's partially completed work means inheriting their footings, their framing, and their permit history, and we will not put our license behind work we cannot verify.
What we can do is come look at it. If it is sound, we will tell you what it takes to finish. If it is not, we will tell you that too, in writing, which is useful whether you hire us or take it to an attorney. Either way you stop guessing.
Bring whatever you have: the contract, the permit, the payment record, and photos of the current condition.