What It Costs
to Build

Honest ranges for ADUs, shops, garages, pole barns, and storage buildings in southeastern North Carolina. Not a quote — a starting point so you can tell whether your budget is in the right neighborhood before anyone comes out.

Get a Real Number What Drives Cost
Read This First

Why Most Contractors
Won't Publish Numbers

Because numbers create accountability, and because every site is different. Both of those are true. But refusing to give anyone a range wastes everybody's time — you end up sitting through three sales visits before you learn a project is double your budget.

So here is the honest version: the ranges below are what projects actually cost in New Hanover, Brunswick, Pender, and Onslow counties. The spread is wide because finish level, foundation type, site access, and utility work genuinely move the number that much. Where you land inside a range is a conversation, not a mystery.

ADUs, Guest Houses & In-Law Suites

Stick-built, permitted, finished living area. Excludes site work and fees.

ADU TypeSizeTypical RangePer Sq Ft
Studio ADU / backyard cottage300–450 sq ft$60K–$115K$190–$260
One-bedroom ADU / guest house500–650 sq ft$90K–$170K$180–$260
Two-bedroom ADU / in-law suite700–900 sq ft$130K–$235K$180–$260
Garage apartment (living space above garage)600–800 sq ft + garage$120K–$260Kvaries
Garage conversion to ADU400–600 sq ft$55K–$130K$130–$220
Attached ADU / in-law addition400–800 sq ft$70K–$190K$170–$240
Pool house with full bath & kitchenette200–400 sq ft$45K–$110K$210–$280

Full ADU details →

Custom Shops & Workshops

Permitted, coastal wind-engineered. Shell plus basic electrical; interior finish varies.

Shop SizeSquare FeetTypical RangeNotes
24×30 workshop720$35K–$60KHobby shop, one to two bays
30×40 shop1,200$55K–$95KMost requested size
40×60 shop2,400$85K–$140KWorking shop, lift-capable
50×80 shop4,000$130K–$250K+Small commercial scale
Insulation package+$4–$10 / sq ftBatt or spray foam
Bathroom (half / full)+$8K–$22KUnder-slab plumbing required
Mezzanine / loft+$25–$55 / sq ftCheapest square footage available
Mini-split HVAC+$4K–$12KPer zone, sized to insulation

Full shop details →

Detached Garages

Slab or pier foundation, overhead and walk doors, siding matched to your home.

Garage TypeCommon SizeTypical RangeNotes
One-car detached14×24$12K–$28KMinimal storage
Two-car detached24×24$18K–$45KHighest-volume build
Two-car with storage depth24×28–24×30$24K–$55KRoom for a bench
Three-car detached24×36$30K–$65KThree bays
Four-car / garage-plus-shop30×40+$45K–$95KBest value per bay
RV or boat garage, tall door16×40, 14–16 ft walls$40K–$95K12–14 ft overhead doors
Loft / attic storage+$6K–$20KStorage-rated trusses and stair
Carport, freestanding20×20$6K–$18KCover without enclosure

Full garage details →

Storage Buildings & Pole Barns

Post-frame construction, engineered for the applicable coastal wind zone.

StructureCommon SizeTypical RangeNotes
Small storage building12×20$8K–$20KYard and lawn equipment
Open-sided pole barn24×30$12K–$30KRoof and columns, open walls
Enclosed storage building30×40$25K–$60KSided, lockable, doors
Large equipment / ag building40×60$45K–$110KTractors, implements, hay
Boat / RV storage, tall16×40+$30K–$80K12–14 ft doors
Horse barn with stalls36×36$45K–$120KStalls, tack, ventilation
Lean-to addition12 ft deep+$25–$55 / sq ftAlong either long wall
Concrete slab (vs. gravel)+$7–$14 / sq ftThickness and reinforcement dependent

Full storage building details →

The Variables

What Actually Moves the Number

Two identical buildings on two different lots can differ by $40,000. Here is where it comes from.

🌲

Site Access, Clearing & Grading

Trees, stumps, slope, wetlands, poor soil, and whether a concrete truck can physically reach the pad. Clearing and grading commonly runs $2,000–$15,000, and a difficult site can go well beyond that. This is the single most underestimated line item.

💧

Utilities, Septic & Sewer

Running water, sewer, and power to an outbuilding costs real money based on distance and obstacles. For an ADU on septic, capacity is the make-or-break question — a system expansion can run $8,000–$25,000, and a new system more. City sewer connection means impact fees.

🧱

Foundation Type

Gravel floor, monolithic slab, thickened-edge slab, stem wall, or piers. A slab adds roughly $7–$14 per square foot over gravel, and lift-rated or elevated foundations cost more again. Flood zone elevation requirements can change this dramatically.

🎨

Finish Level

On an ADU, the same 600 square feet can be built for $110,000 or $170,000 depending on cabinets, countertops, flooring, fixtures, and trim. On a shop, it is insulation, interior sheathing, lighting, and whether you condition it.

🚪

Doors, Height & Spans

Every foot of wall height and every foot of door width costs money in framing, headers, and hardware. A 14-foot overhead door is not a small upgrade over a 9-foot door — it changes the structure around it.

📋

Permits, Fees & Engineering

Permit and impact fees, surveys, soil evaluations, stormwater review, engineered drawings, and any variance application. On an ADU these commonly total $3,000–$15,000+ depending on jurisdiction and whether you need a variance.

🌪

Coastal Wind & Flood Requirements

Higher wind zones mean more fasteners, heavier connectors, stronger doors, and specific roof attachment. Flood zone parcels may require elevated construction and flood venting. Non-negotiable, and priced into every job we do.

💰

Market Timing

Material pricing and subcontractor availability move. We hold written proposals for a defined period and tell you plainly when a number is exposed to a commodity we cannot lock.

Our Estimate Process

Why We Charge $250

A free estimate is not free. It is paid for by the customers who sign, which means honest people subsidize tire-kickers — and it pushes contractors toward optimistic numbers that climb once you are committed.

We charge $250 for a site visit and a written, itemized proposal. We come out, take real measurements, check setbacks and site constraints, and put a number on paper that we will stand behind. The $250 is credited back to your project at contract signing.

If you are comparing three contractors and two gave you a verbal ballpark over the phone, you do not have three estimates. You have one estimate and two guesses.

Request an Estimate
What $250 Buys

Included in Your Estimate

  • On-site visit and measurements
  • Zoning, setback, and lot coverage check
  • Site access and grading assessment
  • Utility and septic feasibility review
  • Written itemized scope of work
  • Line-item allowances for finishes
  • Permit and fee estimates for your jurisdiction
  • Realistic schedule with permitting time included
  • Credited back in full at contract signing

Get a Number You Can Build On

Ranges get you oriented. A site visit gets you a number. $250, credited back at signing.